Laserfiche WebLink
<br />Phase X: (Con't.) <br />a determination will be made on the conversion of the building and <br />parking Facilities to supplement the recreational use or their <br />removal. <br />The results of the above mining phases will be three separate ponds with <br />' , surface:areas of approximate],y 17.0, 23.0 and 9.9 acres. The total pond <br />area of about 50 acres is 57~ of the total site surface. Often times as <br />much as 95~ of the available land is left as pond area in gravel pits <br />located along the rivers. This is indicative of the owners desire to <br />leave a tract of land that has a combination of beneficial recreational <br />uses. <br />Also, if desired, with minor revisions in the dike elevations, the ponds <br />could be used as detention areas to store large quantities of storm water <br />during large frequency storms. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />