Laserfiche WebLink
<br />' 3. TIME SCHEDULE: <br /> Based on the gravel requirements of the existing contracting business of <br />' the Geiserts and taking into considerati on the future growth and demands <br /> of the area, the following time table was detemined to be a reasonable <br />' projection. The Use Rate was based on a 20~ per year growth in the first i <br /> five years and 10~ per year therafter. On this basis, the time to complete <br />' this gravel pit operation would be about 12-1/2 years. Many combinations <br /> of factors c ould influence the timetable , but at this time an operational <br /> period of 10 to 15 years is anticipated and appears reasonable. <br /> <br /> TIMETABLE (Based on Annual Rates Shown) <br />' YEAR RATE ACCUP'P4[TIJITIVE AREA POND <br /> TONS NUMBER NUMBER <br />' 1 200 200 <br />' 2 240 440 <br /> 3 290 730 1 <br /> 4 350 1080 <br /> 5 420 1500 2 <br />' 6 460 1960 3 1 <br /> 7 510 2470 4 <br />~' 8 560 3030 4 <br /> 9 620 3650 5 <br /> 10 680 4330 6 <br />' 11 750 5080 7 2 <br /> 12 5830 <br /> <br /> 13 6580 8 3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />