My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110734
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:28 PM
Creation date
11/24/2007 7:59:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978210
IBM Index Class Name
Permit File
Doc Name
PROPOSED MINING OPERATION
Section_Exhibit Name
EXHIBIT D
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' Phase V: <br />The overburden from Area 5 will be used to shape and provide topsoil <br />for Area ~+. The 20 foot dike will be continued along the Poudre <br />River. Care will be taken along the Easterly edge of Area 5 to <br />protect any living trees and to provide a buffer to the Greeley <br />Saddle Club area. <br />' The area will then be mined in the standard manner. <br />Phase VI & VII: <br />' These areas will be handled in the standard "block" manner. The <br />irrigation water will have to be rechanneled or piped to continue <br />1 serving the field in Area 8. Completion of the mining in Area ~ <br />will complete the second pond. <br />~ ~ Phase VIII: <br /> This is the last area to be mined. Jverburden from this area will <br /> be used to shape and provide topsoil to Area ~. <br /> Overburden and topsoil necessary for the reclamation o£ Area 8 will <br />' be stockpiled in Area 9. Also at the time Area 8 is opened for <br />i <br />i <br />th <br />i <br />lt <br />l <br />f th <br />ti <br />t <br />ill <br />i <br />i <br /> m <br />n <br />ng, <br />cu <br />e agr <br />ura <br />e <br />rr <br />on wa <br />er w <br />cease. <br />use o <br />ga <br /> At this time, the water will be available for both reclamation pro- <br />' cedures and/or water augumentation. <br />, Area 8 will then be mined in the standard manner and then reshaped <br />' and topsoiled with the stockpiled material. <br /> Phase IIC: <br />' l <br />ti <br />£ A <br />F <br />th <br />l <br />ld <br />it <br />d <br />t <br />~ oca <br />on o <br />rea 9. <br />ur <br />er exp <br />or- <br />An o <br />c <br />y dump en <br />s <br />s in the <br /> ation will be required to determine the actual limits. The dump <br /> area will not be mined and adequate cover will be maintained to <br /> separate the two uses. Area 9 will be reshaped at the same time <br />' Area 8 is being completed. <br /> Phase X: <br />' rth <br />ortion of Area 10 has been used <br />evi <br />u <br />nti <br />ned <br />th <br />N <br />A <br />l <br /> p <br />y me <br />o <br />, <br />s pr <br />o <br />s <br />e <br />o <br /> for the office and maintainance area during the mining operation. <br /> At the completion of the mining in Area 8, and the final shaping of <br /> Areas 8, 9, and 10, the site work will be completed. At this time, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.