Laserfiche WebLink
~' <br /> <br /> <br /> <br /> <br />As part of Phase I, it is anticipated a portable gravel crushing unit will <br />be used to stockpile a quantity of crushed material to provide a more com- <br />plete line of aggregate for the Geisert's operation. This stockpile is <br />to be located at the Northeast corner of Area 3. It is anticipated that <br />this crusher operation will occur periodically as required to maintain a <br />supply of this type of aggregate. <br /> Phase II: <br /> The overburden will be removed from Area 2 and used to provide shaping <br /> and topsoil for the Southerly part of Area 1. Area 1 will be seeded <br /> <br /> and planted at this time. Area 2 will then be mined in the standard <br />' manner. <br />Phase III: <br />' The overburden will be removed from Area 3 and used to provide shaping <br />and topsoil for the Northerly and Westerly banks of Area 2. These <br />banks will then be seeded and planted. The irrigation ditch across <br />' Area 3 will be relocated along the access road so irrigation water can <br />be provided to cultivated areas to the East. Area 3 will then be mined <br />' in the standard manner. <br />' Phase IV: <br />The overburden from Area 4 will be used to shape and provide topsoil <br />for Area 3. At this time the first pond will be completed and the <br />final reclamation phases on this area can commence. Additional over- <br />burden from Area 4 will ba used to continue the 20 foot dike along <br />' the River. <br />Area 4 will then be mined in the standard manner. <br /> <br />1 <br />