Laserfiche WebLink
Task <br /># Description Time Needed <br />months <br />1 Salvage topsoil from 6.0 acre portion of Area 1 to stockpile. 0.5 <br />2 Construct sediment pond in north central part of disturbed area and place <br />berm around entire permit area. 0.25 <br />3 Strip overburden from 6.0 acre portion of Area 1, place in stockpile and <br />unmined area. 0.25 <br />4. Bring in portable crusher, screen plant, stackers, truck scale, scale house. 0.25 <br />5 Mine Area 1 .(Approximately 8.0 acres) 40.8 <br />6 Remove soil/overburden from Area 2 and backfill into Area 1. 1 <br />7 Mine Area 2. 46.8 <br />8 Remove soil/overburden from Area 3 and backfill into Areas 1 and 2 1.0 <br />9 Mine Area 3. 33.6 <br />10 Remove soil/overburden from Area 4 and backfill into Areas 1 and 2 and <br />3 and place a portion in stockpile on northeast part of permit area. 1.0 <br />11 Mine Area 4. 45.6 <br />12 Move facilities from Area 5 to previously backfilled area .5 <br />13 Remove soil/overburden from Area 5 and backfill into Areas 1,2,3 and 4 1.0 <br />14 Mine area 5. 39.6 <br />15 Backfill pads and lake slopes for Area 5 using material temporarily <br />stored in the pit. 1.0 <br />16 Remove all facilities. 0.5 <br />17 Reseed and mulch lake slope area and upper pad areas. 0.25 <br /> Total 213.9 <br />5. Road Access <br />Primary access to the property is 15 Road to US Highway 50. The haul route from the pit initially <br />uses an existing access road ROW on the Western Slope Iron property. This property was sold to <br />15 Road Pit 10/02 17 <br />