Laserfiche WebLink
Asphalt production will normally occur periodically between the months of March and November. <br />Any asphalt production which occurs will be limited to the identified staging area. The plant will <br />meet or exceed all State and Federal pollution requirements, and is inspected on a regular basis by <br />governmental authorities. Hot bituminous pavement made on site is not stored in the permit area; it <br />is taken directly to the job site. The operation will use an existing graveled access road (15 Road} to <br />gain access to Highway 50. Primarily, 24 ton belly dumps will be used to haul both asphalt as well <br />as some washed sand and gravel to job sites. Most raw sand and gravel will be shipped with 14 ton <br />tandem trucks. <br />No explosives will be used at any time during the mining or reclamation operations. No digging <br />will be allowed within 30 feet of the overhead powerline and no digging will be permitted within <br />50' of the buried gas line. See documents in Exhibit S -Permanent Man-Made Structures. <br />Of the total permit area of 188.54 acres, the total disturbed area is 184.64 acres. The breakdown of <br />this acreage is given below. It is based on the areas of full mining and is not a worst case distur- <br />bance for the life of the pit, since many areas will be reclaimed as new areas are mined. <br />Permit Area Description Acreage <br />1. Soil/Overburden Stockpiles 7.5 <br />2. Sediment Pond 0.9 <br />3. Mining Areas to be reclaimed as lakes and industrial pads. Includes Process- <br />ing area with stockpiles, scale, trailer, fuel farm. 158.1 <br />4. Internal Roads 11.2 <br />5. Gas Line & Power Line ROWS 6.9 <br />6. Undisturbed Area 3.9 <br />Total 188.5 <br />4. MiningTimetable <br />The following timetable is a best estimate of the sequence of operations for the life of the mine after <br />December of 2002 and is based on mining and selling 450,000 tons of total product per year (this is <br />less than the permit maximum rates but are expected averages): <br />15 Road Pit10/02 16 <br />