My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110599
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:21 PM
Creation date
11/24/2007 7:52:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />Reclaim Tunnel <br />This 13-foot diameter, 350-foot long multi-plate tunnel is located at the <br />highway stockpile. A 42-inch diameter, 160-foot long escape tube provides <br />ventilation and emergency exit from the west (closed) end of the reclaim <br />tunnel. The escape tube terminates at a concrete fan housing that is <br />approximately 6-feet by 6-feet by 8-feet high. The ventilation fan will not <br />push air to the south over the highway. <br />Loadout Transfer Buildino <br />The loadout transfer building is a structural steel building where the reclaim <br />belt terminates. The coal transfers to the loadout conveyor. The dimensions <br />of the building are approximately 20 feet by 20 feet by 45 feet high. <br />Loadout Structure -Batch Weigh System <br />The loadout structure is a structural steel building where the loadout <br />• conveyor terminates. The coal is batch weighed and loaded into rail cars at <br />this location. The dimensions ofthe building are approximately 30 feet by 40 <br />feet by 120 feet high. <br />Railroad Track <br />I• <br />PR-07 <br />Unit trains will approach the loadout from the west and switch off the <br />mainline to the south and enter the lead track. The lead track is <br />approximately 8240-feet long. There is also a parallel storage track that is <br />3,570 feet long. Approximately 2800-feet of main line trackwill be relocated <br />to facilitate construction of the loadout. <br />Conveyor Underpasses <br />Three conveyor underpasses were constructed for the downhill conveyor <br />project. One is located on the portal bench. The second is located <br />immediately below the downhill conveyor transfer building. The third is <br />located about midway along the downhill conveyor and will serve as a wildlife <br />overpass. A fourth conveyor underpass will be constructed to provide haul <br />road access over the downhill conveyor to the B-Seam portal bench. The <br />underpasses are 9-foot diameter multi-plate and are approximately 100-feet <br />long. <br />2.05 - 15 - 2/03 <br />I PQDVbD <br />5 ~t 2/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.