My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110584
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:21 PM
Creation date
11/24/2007 7:52:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981032
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
CHAPTER C APPENDIX L REFUSE DISPOSAL FACILITY CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO qiC HARD D. L>r.1M, Gn~c~n nr <br />D EP ART htENT OF NATURAL RESOURCES <br />D. Monse Pascoe, E><ecutive Director <br />11 L\ ED LAND R ECI.A11 a'TIO~' <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (3013)_839-3567 <br />I'; -:-==" ~li J (j},t David C. Shelton <br />it {~-~L:~~U' =~U.~ Director <br />October 27, 1980 <br />OCT 2 9 1980 <br />Mr. Greg Lewicki <br />Northern Coal Company <br />P. O. Box 17583 T.R. <br />Denver, Colorado 80217 <br />Re: Northern Coal Company Refuse Pile <br />Our File No. 79-9 <br />Dear Greg: <br />This Letter is to inform you that the Mined Zand Reclamation staff has <br />reviewed your amendment application and is ready to grant partial <br />approval. Construction of the sediment control system and topsoil <br />stripping may proceed. No refuse is to be placed in the pile until <br />additional data as requested by Roy Cox is submitted. The following <br />are additional conditions to approval: <br />1. This approval only covers phase 1 of the plan; <br />2. The ground water system should be modified to allow verification <br />of the trench drains effectiveness; <br />3. The sediment control system although oversized for phase 1, <br />be built as stated in the October 7th letter from Espey, Huston <br />and Associates to Northern Coal Company. <br />If you have any questions or comments, please call me. <br />Sincerely, <br />im Herron <br />Reclamation Specialist <br />/k <br />
The URL can be used to link to this page
Your browser does not support the video tag.