Laserfiche WebLink
<br /> <br />~ 10. Sloping - A minimum 3 to 1 slope shall be left to a depth <br /> of 10 feet below water level, and 2 to 1 thereafter to <br /> the bedrock floor. The floor of the pit will be left in <br /> a level condition. <br /> <br /> 11. Excavation Limits - Along all sides of the property exca- <br /> vation shall not take place within 25 feet of the property <br /> line. Twenty-five feet will not disturb the existing <br /> ditches on the south or north sides. This excavation will <br />~ f <br /> come within 125 feet of the Plowman's structures on the <br /> south. However, since Mr. Plowman is one of the purchasers <br /> of the property, by participating in the conditional use <br /> request he is granting permission to come this close (Adams <br />• <br />' County prohibits mining within 125 feet of a residence with- <br /> out permission). This 25 foot area amounts to 3.1 acres. <br /> In addition, along both Nome Street and 132nd an additional <br /> 75 feet will not be mined but only graded to fit final con- <br />• <br /> tours in order to provide stability for homesite construc- <br /> tion and septic tank installation. This additional 75 feet <br /> amounts to just over 4 acres. A total of approximately 7+ <br /> acres will be left undisturbed or receive minor disturbance. <br />• <br />i 12. Estimated Development Schedule and Other Data - Projected <br /> to begin in 1985-86 upon completion of the property to the <br /> south. <br />~ Total Acres to Estimated <br /> Time Acres be Mined Tons <br /> Phase I - 12-18 months 13.2 9.2 920,000 <br /> Phase II - 6-9 months 9.2 6,5 650,000 <br />~ Phase III - 10-14 months 9.4 8.6 860,000 <br /> Phase IV - 12-18 months 12.9 10.7 1,070,000 <br /> 42-60 months 42.7 35.0 3,500,000 <br />~ The above is an estimate only, as market rnnditions will de- <br /> termine sales. <br />13. Other Standards - All the operations shall comply with noise <br />vibration, safety, air emissions, and other standards re- <br />• <br />quired by relevant County, State, and Federal laws, rules, <br />and regulations. Where there is an overlap between such, <br />the more restrictive shall govern. <br />~ 14. Water impoundment or Diversion - No impoundment or diver- <br />sion of water will be required for development of this mine. <br />No dewatering will be undertaken. <br />• <br />• <br />