Laserfiche WebLink
i <br />' • <br /> 2. Fencing - Prior. to beginning excavation the entire property <br />i <br /> will be enclosed with 72 inch chain link fence topped with <br /> three strands of barb wire. One gate for entrance/exit will <br /> be installed. This fence will remain until rehabilitation <br /> grading has been completed. <br />~ <br /> 3. Haul Roads - internal private roads will be graveled and <br /> maintained in a dust free condition, including treating with <br /> an emulsified dust suppressant if necessary. <br />~ 4. Haul Routes - It is anticipated that most of the traffic to <br /> and from the site will utilize Nome Street south to US 85, <br /> ' then south into the Denver Metropolitan Area (75x). Some <br /> traffic will also exit north on Nome Street to 132nd to <br />~ US 85 then north toward Brighton (15x). Finally, a smaller <br /> percentage of vehicles will exit south on Nome to US 85, <br /> south to 124th, then west toward North Thornton (10x). <br /> These percentages are based on preliminary indications from <br />~ ~ the operating gravel pit to the south. The maximum amount <br /> of truck loads anticipated is 100 per day or less than 10 <br /> per hour. Since all of the above mentioned roads are paved <br /> and not°at capacity, this operation will not cause any over- <br />~ load, especially when one considers this operation will simply <br /> replace the existing one to the south and not add to it. <br /> No acceleration or deceleration lanes are planned as the <br /> amount of traffic does not ,justify it, and the County has <br />~ not required similar size and even larger operations to in- <br /> stall such lanes along Nome Street. <br /> 5. Sanitary Facilities - Bottled water will be provided and <br /> san-o-lets for employees, visitors, truck drivers use. <br />• <br /> 6. Water for Dust Suppresion/Evaporation/Revegetation - Water <br /> for these uses will be pumped out of the created lake. A <br /> change in use of existing water rights to allow this from <br />~ water court will be obtained. <br /> 7. Lighting - An outside light on or near the trailer may be <br /> installed to help visibility for vandalism control. <br />8. Fire Protection - Brighton Fire Protection District <br />~ The property to the south will have a fill station for the <br />District's use. <br />9. Signs - A stop sign will be installed at the gate. Other <br />~ warning signs may be installed along Nome Street if the <br />County requires it. In addition, a small sign will be install- <br />ed at the entrance giving the address, name of the operation, <br />emergency phone number, and hours of operation. <br />• <br />