Laserfiche WebLink
' •' <br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task #... 8 Prep. by WHE Filename..M027-8 <br />----------- ------- ---- --- <br />Date..... 12-Nov-96 Permit # M-76-021 Mine......Craig Pi[ <br />Permit Action. General 112 bond recalculation. <br />Task Description..... Transport reclamation equipment to and from job site.. <br />HOURLY EQUIPMENT COST <br />NOTE -This is a list to select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tractor 6x4, 75.000 lb GVW, 315 HP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck. drop deck <br />-Med. Trailer 50 ton folding gooseneck. Ar•op deck <br />-Hvy. Trailer 120 Ton folding gooseneck. drop deck <br />-Pilot Car On•highway light duty truck. 4x2. 130 hp, 1/2 ton rating. gasoline powered <br />-Hyd. Crane Grove RT58D rough terrain hydraulic crane. 20 ton capacity. 125 hp, 60 ft. boom <br />-Fuel Truck :6x4, 3.600 gallon capacity, 210 HP, diesel. powered <br />-Cube Truck :6x4. 2,500 gallon capacity, 210 HP. diesel powered <br />-Flatbed Truck: 20,000 lb GVW. 175 HP. diesel powered <br />Last Up ate: ------------------------------------------ <br />------------------------------------- <br />December. 1994 <br />-------------- Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26.50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = 527. 88 531. 23 538 .36 51. 81 519. 89 56 .95 512 .79 55. 71 <br />Operating Cost/hr = 526. 84 529. 29 534 .21 55. 12 523. 40 518 .53 524 .52 58. 00 <br />Operator Cost/hr = 521. 40 522. 03 522 .03 521. 24 520. 86 521 .24 521. 24 521. 24 <br />Helper Cost/hr = 520. 60 521. 24 521 .24 50. 00 50. 00 50 .00 50. 00 50. 00 <br /> Total = 596. 72 5103. 79 5115 .90 528. 17 564. 15 ~ 546 .72 558 .55 534. 95 <br />NON-ROADABLE EQUIPMENT: <br />------------- --------- Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost /hr Cost/hr Cost/ea <br />CAT D8N SU~bl ade 39. 50 546. 40 5103. 79 I 5150 .19 5103. 79 <br />Revegetation Equipment 10. 00 510. 00 596. 12 1 5106 .72 596. 72 <br />Subtotals 5256.91 5200.51 50.00 <br />