My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110098
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:01 PM
Creation date
11/24/2007 7:30:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Section_Exhibit Name
Tab 19 Reclamation Schedule
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These variance areas and proposed schedule are depicted on Exhibit 19-1A, Backfilling and Grading <br />• Schedule. The corresponding mining schedule is shown on Exhibit 12-3, Operations Plan. <br />A mine progression and sequencing dates (scheduling) are for estimation purposes only. The original <br />dragline planning was developed to meet coal delivery contracts and could fluctuate based on power <br />plant demand, coal orders could increase o decrease on a monthly basis. The introduction of the <br />Highwall Miner to the operations adds another variable to the overall timing presented on Exhibits 12-3, <br />12-3a, and 12-3b. This current mine plan is based on meeting existing coal delivery contracts. <br />The highwall miner is scheduled to begin operating at the Yoast Mine in the spring of 2004 and then <br />proceed to II-W in late spring/early summer of 2005. This scheduling depends on a number of factors <br />that rely on operating conditions. The mine plan is based on the highwall miner penetrating 600 feet <br />into the coal seams. The timing for moving to other blocks could change depending on pit and coal <br />seam conditions. For instance: <br />- if the average highwall miner penetration distance is less or more than designed 1600 feet <br />penetration), the timing will change or, <br />- if the coal seam characteristics or pit conditions encountered are different than predicted and <br />won't allow coal recovery or conversely will allow additional coal recovery, the timing will <br />change <br />• These changes to the timing could be significant and could change the overall timing Iby year) of the <br />projected mine plan and ultimately the final reclamation schedule. <br />The most significant disturbance is advance topsoil removal which must be completed by November 1 <br />of each year in order to allow the overburden removal operation to continue during the winter and wet <br />spring months. <br />The efficient removal of topsoil at Seneca II-W is considered to be virtually impossible during the six- <br />month period from November 1 to May 1 of any given year. Consequently, at the end of any given <br />year, approximately one-third of the coal acreage to be mined during the next year will have been <br />disturbed by topsoil removal activities. The total annual disturbed acreage figures in the table include <br />the coal areas mined and the advance topsoil removed areas, as well as the other disturbances <br />including spoil areas, existing and proposed haul roads, power lines, storage yards, and facilities. <br />In order to avoid the confusion created by too many overlapping yearly lines, only the graded areas for <br />each year are shown on the Backfilling and Grading Schedule, Exhibit 19-1 and 19-1A. The facilities <br />including utility lines, haul roads, drainage and sediment control structures, and the dragline erection <br />pad are illustrated on Exhibits 12-2 and 12-2a and Exhibits 13-1 and 13-1A, and are described in Tab <br />• 13. The areas of land that will be disturbed through the five-year permit term are shown on Exhibits <br />20-1 and 20-1A. The backfilling and grading schedule is shown on Exhibit 19-1 and 19-1A. <br />Reclamation costs are discussed under Tab 25, Bonding. <br />PR04 5b Revised 09!04 <br />