My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110098
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:01 PM
Creation date
11/24/2007 7:30:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Section_Exhibit Name
Tab 19 Reclamation Schedule
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Scheduling <br />Action Taken <br />Bonds procured <br />Time Period <br />Prior to mine disturbance <br />• <br />Sediment Control <br />Topsoil removed and stored <br />Prior to mine disturbance <br />Prior to mining excavation <br />Rough grading Prior to creating 4 spoil ridges or less than <br />180 days unless approved by variance (see Exhibit 19- <br />1) <br />Final grading (Phase I bond release Per schedule shown on Exhibit 19-1 and 19-1A <br />is ready for implementation) <br />Spoil sampling After final grading is completed and prior to <br />soil replacement in areas shown on Exhibtt 6~ <br />Postmine Channel Construction Permanent channel construction including riprap <br />installation will be completed within one year of <br />completion of the final grading of adjacent backfill • <br />slopes, and prior to topsoiling of area adjacent to <br />the channel. <br />Areas which are severely compacted <br />will be ripped on the wntour, and <br />topsoil replaced from stockpiles <br />or direct hauled <br />Area is drill seeded with the <br />appropriate perennial seed mix, <br />is seeded, shrubs or trees are <br />planted as spring or fall <br />dormant plantings (Phase II band <br />release is ready for implementation). <br />A small grain cover crop is applied <br />at a rate of 20 (drilled) or 40 <br />(broadcast) Ibs/acre <br />Within one year after final grading is <br />completed, provided the area is not required <br />for facilities as described in the Projected <br />Backfilling and Grading Schedule section <br />First appropriate planting season <br />after topsoil is replaced <br />• <br />PR04 I 6 Revised 9/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.