My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110098
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:01 PM
Creation date
11/24/2007 7:30:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Section_Exhibit Name
Tab 19 Reclamation Schedule
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
timetable and site conditions, and will repre <br />completed within one year following final <br />monitoring-related activities li.e., items su <br />roads, haul roads, ponds, drainages, dives <br />achieved during fall or winter months, ; <br />accommodate fall seeding. When final Brat <br />be redistributed by fall to accommodate fall <br />A variance to Rule 4.14.1 Itllcl is reque: <br />and future mining area. The final highw <br />mining. Angering has been completed <br />completed. It is anticipated that the bay <br />proposes to replace the auger mining tec <br />highwall miner operation are discussed in <br />The areas of variance include the folk <br />accommodate highwall mining and to bring <br />• A Pit <br />- Ridgeline Pit - 1,600 feet <br />without HW miner) <br />- 1,600 feet to be coml <br />• B Pit <br />nt reclaimed acres in Table 19-1. Soil replacement will be <br />ading, provided the area is not being used for facility or <br />~ as, but not limited to ramps, deadhead routes, light use <br />ins, boneyards, office, or shop areas). If final grade is <br />I will be redistributed the following summer or fall to <br />is accomplished during spring or summer months, soil will <br />;eding. <br />for select areas of the final dragline highwalls in existing <br />in the A Pit areas were left open to accommodate auger <br />these areas and backfilling efforts are close to being <br />ing efforts will be completed by the end of 2003. SCC <br />lue with a highwall mining technique. The details of the <br />ichment 12-4. <br />select portions of final dragline pits in order to <br />is of the A and B pits into compliance. <br />to be completed by end of 2004 lapproved in TR-46 <br />by end 2005 (with HW mining) <br />- Approximately 18 acres adjace t to active pit to be graded along with BPit -backfilling to <br />be completed by March 31, 004 lapproved in TR-46 final pit backfilling completed <br />December 20031. <br />• Wadge Pit III-W South) <br />- 2,800 feet -backfilling to be <br />2005/2006) <br />- 2,000 feet -backfilling to b <br />mined in 2005) <br />- 2,800 feet - Backfilling to h <br />mined in 2006 <br />Although this variance request consists of <br />maximum cumulative pit length to be open <br />one time would be 8,400 feet in the year 2 <br />in 2006 (dragline mined in 2002, HW mined in <br />completed in 2006 (dragline mined in 2002/2003, HW <br />completed in 2007 (dragline mined in 2003/2005, HW <br />feet of final highwall, it should be realized that the <br />the 180-day regulation for final dragline pits at any <br />• <br />• <br />• <br />PR04 5a Revised 04/04 <br />