Laserfiche WebLink
r <br />• <br />• <br />SENECA COAL COMPANY <br />2001 RN-03-SENECA IIW <br />GRADE POND EMBANKMENTS 009, 015, 016 DATE: 09-Mar-01 <br />SUMMARY SHEET <br />EQUIPMENT REQUIRED <br />-CATERPILLAR D11N DOZER <br />VOLUME TO BE MOVED <br />TOTAL VOLUME 30,000 LCY <br />DOZING PRODUCTION <br />DOZING DISTANCE 150 FT <br />GRADE 0 <br />BLADE TYPE U <br />PRODUCTION 1839 LCY/SCH HR <br />SLOT DOZING 1 <br />MATERIAL 0.9 <br />VISIBILITY 1 <br />ALTITUDE 0.93 <br />SPOIL FACTOR 0.8 <br />UTILIZATION FACTOR 0.83 <br />OPERATOR EFFICIENCY 0.75 <br />ADJ. PRODUCTIVITY 767 LCY/SCH HR <br />DOZER FLEET COST TOTAL EQUIP. <br /> & LABOR UNIT TOTAL <br />EQUIPMENT UNITS COST COST <br />DOZER 1 $340.06 $340.06 /SCH HR <br />TOTAL COST <br />Hours Cost/Hour Total <br />39 $340.06 $13,309 <br />25-1-27 <br />Revised 03/01 <br />