Laserfiche WebLink
• SENECA COAL COMPANY <br /> 2001 RN-03-SENECA IIW <br /> HAUL SURFACE MATERIAL (Facilities) <br /> FACILITIES RECLAMATION ACTIVITIES <br />VOLUME TO BE MOVED <br />SCRAPER FLEET COST <br />Area(ac) <br />17.5 <br />EQUIPMENT UNITS <br />SCRAPER 4 <br />14H 1 <br />WATER TRK 1 <br />TOTAL COST <br />3 See FPC Worksheets <br />• <br />C / <br />Hours (3) <br />27 <br />D(ft) <br />1 <br />26,233 LCY <br />39,479 tons <br />TOTAL EQUIP. <br />8 LABOR UNIT TOTAL <br />COST COST <br />$273.27 $1,093.08 /SCH HR <br />$75.66 $75.66 /SCH HR <br />$56.52 $58.52 /SCH HR <br />CosUHour <br />$1,227.26 <br />Total <br />$33,136 <br />25-1-26 <br />Revised 03/01 <br />