Laserfiche WebLink
SENECA COAL COMPANY <br />• 2001 RN-03-SENECA IIW <br />DREDGE SEDEMENT PONDS <br />FACILITIES RECLAMATION ACTIVITIES <br />DESCRIPTION: Dredge sediment Ponds 005, 006, 009, 015 and 016 <br />Equipment: Dredger <br />Volume: Assume 30 ac-ft, one time <br />Cost: Mob and Demob = $6,775 <br />Pumping $6.32/cy x 48,400 cy = $305,888 <br />Total: <br />$312,663 <br />• <br />• <br />25-1-28 Revised 03/01 <br />