Laserfiche WebLink
<br />' MINING PLAN <br />S%HIBIT D (Continued) <br />road sanding and some of it will be used as needed for sloping <br />during reclamation. <br />' Underlying the overburden is a 10 to 15 foot thick layer of <br />material having cohesive properties that make it valuable for <br />concrete block manufacture. This is the material Dotsero Block, <br />' Inc. is mining and uses in their concrete block plant. <br /> <br />' UNCOp\ <br />L ~ DATED <br />' BLOCK ~ CINDER <br />CINDER. ~ 3$'-46' <br />"'~DDN \ <br />FORMAT ~ ON ~ 16 ~ -15 ~. <br />' < <br />' FIGURE 1 <br />' !lining Plan <br />The current workings are located in Stage 1. Mining will be <br />' from south to north from the current workings to within 30 feet of <br />the permit boundary. Mining in Stage 2 will not begin until all <br />of the mining in Stage 1 is complete. Stage 0 has been mined out <br />' and is currently being used to store equipment and .sanding material. <br />Most of Stage 0 was mined prelaw and no topsoil was segregated and <br />' saved for reclamation. <br />Where applicable mining will not be closer than 30 feet from <br />the affected lands line. Along the west side it will not be <br />closer than 30 feet of the western most road. <br />Any overburden encountered during this period will be stockpiled <br />' to the east of the current workings. This usually entails moving <br />the unusable material with front-end loaders to get at the desirable <br />' material. The topsoil if available will be segregated for use in <br />B <br />