Laserfiche WebLink
<br />(f) Anticipated reclamation costs associated with the <br />proposed pit are shown as cost per acre. All costs <br />include labor. The amount of the pit to be reclaimed is <br />9.98 acres. <br />Backfill & Shaping 3hr @ $100 = $300 <br />Topsoil Application 2hr @ $50 = $100 <br />Seed Cost = $50 <br />Mulch @ $20/ton = $40 <br />Discing/Drilling = $100 <br />590 <br />(2) Equipment costs are included in above estimate. Applicant <br />owns all equipment needed for reclamation. <br />(3) No detoxification, building demolition, well sealing, or <br />stream channel reconstruction will be required. <br />(4) Acknowledged. <br />