Laserfiche WebLink
<br />EXHIBIT E - MINING PLAN MAP <br />Topsoil will be stripped and stockpiled on the south side of the pit. <br />Stockpile slopes will be no greater than 3H:1V. <br />Topsoil is approximately 4" deep and overburden may be 17" deep. <br />General direction of mining will be towards the east and depth will be 30' <br />+, <br />