Laserfiche WebLink
Air Pram Aap6o®a~ Jbr faa~aciv Cad Canes) <br />TABLE 2 <br />,. <br />LORENCITO CANYON MIIVE <br />MAXII1iIJM ANNUAL PMu ffi4iIS5IONS <br />Process Uoeonhn0ed <br />®isdoag Proposed rnntrol Fl[kieocy (96) ControDed <br />i <br />l <br /> <br />(tons/year) oa4 <br />em <br />~ <br />(toas/yrsr) <br />Topsoil Removal 11.39 None NA 11.40 <br />Topsoil stockpile 3.67 Mulch and seed 85 % 3.67 <br /> ([Writ :reclamation <br /> complete) <br />Overburden removal 96.21 Nooe NA 96.21 <br />Drilling coal 1.26 Bag collector 90% 0.13 <br />Drilling overburden 7.46 Bag collector 90% 0.75 <br />Blasting 107.57 None NA 107.57 <br />Active stockpile 1.51 None NA 1.51 <br />erosion at under- <br />ground mine portals <br />I-oading coal to haul 212.91 None NA 212.91 <br />trucks <br />Haul trucks hauling 1462.99 Gravel roads 50% 365.74 <br />coal to rail loadout <br />area Water "as needed" 25% <br /> 75% total <br />Haul trucks returning 783.65 Gravel roads 50% 195.91 <br />empty from loadout <br />to mine Water "as needed" 25% <br /> 75 % total <br />Unloading coal to 0.53 None NA 0.53 <br />loadout stockpile <br />Coal loadout 0.53 None NA 0.53 <br />stockpile wind <br />erosion <br />Coal transfer from 0.81 None NA 0.81 <br />stockpile to rail cars <br />Rail vanspon of coal 0.28 None NA 0.28 <br />to processing plan[ <br />Miscellaneous 211.16 Gravel roads 50% 66.79 <br />vehicles on site <br /> Water "as needed" 25% <br /> 75% total <br />Exposed areas wind 49.17 None NA 49.17 <br />erosion <br />Annual Total 2951.05 1113.91 <br />J <br />• <br />• <br />,u.,,,,,.~~q u. ~~ 13 <br />