Laserfiche WebLink
<br />2.05.4(P) (a)2 <br />~~ A of the uildings and structures will be removed with the <br />excep n of. the existing bridge. The bridge, number 25 on Figure <br />• 2. .4(2 b)-1 will remain. . <br />Clean up c al on the surface. Coal cleaned up at the mine <br />site will a sold .prior to the final covering of the disposal <br />area is will occur during or just after other clean-up on <br />proper <br />4. Backfilling and recontouring. Work will begin following all <br />clean up to establish natural drainage channels. All areas of <br />the mine site except the sedimentation pond will be backfilled <br />and recontoured at this time. This worl; will be completed by <br />September, 1982. Temporary diversions and roads to be utilized <br />by Atlantic P.ichfield Company will remain intact. <br />5. Grading in preparation for seeding. This will be done . <br />September, 1982 following backfilling. <br />• 6. Seeding. TY,is will be done September, 1982 following backfilling <br />and grading. <br />7. Planting trees. Trees will not be planted until vegetation <br />is established, possibly the fall of 1983 or 1984. <br />8. Monitor success of revegetation. <br />9. Remove the sedimentation ponds upon the approval of the <br />Division. <br />10. Reclamation of the sedimentation ponds. <br /> <br />• <br />E9 <br />•1T..T r-~ •• • . <br />