Laserfiche WebLink
:.05.4 (2) (b) <br />A detailed estimate of th %ost of reclamation of the <br />pr osed operations. <br />• The ost of removing all su face structures is based on an. <br />estima a given by a local contractor. Refer to Figure 2.05.4(2)(b)-l. <br />As this estimate was gi en in January of 1980, 15 percent was <br />added to he total: to t~^at this estimate assumes that all <br />salvaged m erial w+ 1 become the property of the construction <br />company remo ing . <br />Revegetation b s were taY.en from figures provided by Mile F?igh <br />Seed, Grand unct on, Colorado. Refer to Table 2.05.4(2)(b)-2 <br />for the r egetatio costs. <br />Table .05.4(2)(b)-1 it mizes the reclamation costs for the Fear <br />Coa Mine assuming that a 1 surface facilities will he re^~oved <br />d the surface revegetated. <br /> <br />Backfil ~ng.will be done .n two areas, the portals and the <br />sedimentation ponds. Pac'~filling will be accomplished using a <br />front end loa er nd Bear Coal Mine employees. _ ~ <br />n ~ F.efer to Volume 2 of 2 for Slope <br />Suability of ~•7est Porta~Area. Backfilling the sedimentation pond <br />will only require grading berms back into the area. <br />The contours of a proposed freshwater pond to be built by ARCC <br />are included in Figure 2.04.3(2)(a)-1. The exact 'construction <br />date for this facility is unkno~m. <br /> <br /> <br />pr~~rcrn .. ,.. i ~ , ~ ~ <br />