My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109630
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109630
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:40 PM
Creation date
11/24/2007 6:36:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 64 EXCERPTS FROM BEAR COAL COMPANY RECLAMATION PLAN FOR BEAR 1 & 2 MINES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2.05.4 Reclamation Plan <br />(1) A plan for reclamation of the lands within the proposed <br />~ permit area. <br />(2) Information for the proposed permit area: <br />• (a) A.detailed timetable for the completion of each major step <br />in the reclamation plan. <br />The Bear Coal Company's surface facilities are located on private <br />lands owned by Atlantic Richfield Company, (ARCO) and U.S. Steel <br />Corporation. Cessation of t4ining will occur June 30, 1982. <br />Atlantic Richfield Company will be responsible for the Freshwater <br />Pond f2 and the 44 Kv Powerline outside of the Delta-Montrose <br />Electric Association Corridor. <br />Construction of the new Highway 133 is to effect everything <br />(~.. Nortk: of t`~e river, between the River and the railroad siding. <br />( The Highway Department will assume responsiblity for reclamation- <br />• Refer to Figure 2.05.4(2)(a). <br />1. Seali portals in accordance with Colorado Division of Mines, <br />M. .. and Section 2.05.4(2)(g), This will be done September, <br />1982. <br />• _ Removal f buildings, structures, supplies, mining equipment, <br />and er extraneous material around the property, This wcr:: will <br />st t Ju 1, 1982 and will be finished subsequent to the mine <br />Baling in September, 1982. <br /> <br />er to le 2.05.4(2)(a)-1 for a detailed time table of the steps <br />in ~ m al of the structures and reclamation of the area. <br />1 <br />• REVISED May 15, 1981 68 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.