Laserfiche WebLink
Section 2.05.4 Reclamation Plan <br />(1) A plan for reclamation of the lands within the proposed <br />~ permit area. <br />(2) Information for the proposed permit area: <br />• (a) A.detailed timetable for the completion of each major step <br />in the reclamation plan. <br />The Bear Coal Company's surface facilities are located on private <br />lands owned by Atlantic Richfield Company, (ARCO) and U.S. Steel <br />Corporation. Cessation of t4ining will occur June 30, 1982. <br />Atlantic Richfield Company will be responsible for the Freshwater <br />Pond f2 and the 44 Kv Powerline outside of the Delta-Montrose <br />Electric Association Corridor. <br />Construction of the new Highway 133 is to effect everything <br />(~.. Nortk: of t`~e river, between the River and the railroad siding. <br />( The Highway Department will assume responsiblity for reclamation- <br />• Refer to Figure 2.05.4(2)(a). <br />1. Seali portals in accordance with Colorado Division of Mines, <br />M. .. and Section 2.05.4(2)(g), This will be done September, <br />1982. <br />• _ Removal f buildings, structures, supplies, mining equipment, <br />and er extraneous material around the property, This wcr:: will <br />st t Ju 1, 1982 and will be finished subsequent to the mine <br />Baling in September, 1982. <br /> <br />er to le 2.05.4(2)(a)-1 for a detailed time table of the steps <br />in ~ m al of the structures and reclamation of the area. <br />1 <br />• REVISED May 15, 1981 68 <br /> <br />