Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet t of 2 <br />ESTIMATING FORM - EGUI PMENT MOBILIZATION / DEMOBILIZATION <br />Task tl... 6 Prep. by BLP Filename..X219-6 <br />Date..... 23-Mey-96 Permit tl X-96-219 Mine......COttonuood Land <br />------'---' -------- --------------- <br />Permit Action........ NOI <br />Task Description..... Mobilization/Demobilization <br />___________________________________________ <br />HOURLY EGUI PMENT COST <br />NOTE - This is a list to select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tractor 6x4, 75,000 lb GW, 375 HP, diesel powered <br />-Lt. Trailer : 25 ton folding gooseneck, drop deck <br />-Med. Trailer 50 [on folding gooseneck, drop deck <br />-HVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />-Hyd. Crane Grove RT580 rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boon <br />-Fuel Truck 6x4, 3,600 gallon rapacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20,000 lb CW, 175 HP, diesel powered <br />Last Update: -------------------°-°-'------ _______------- ------------ --"------------- ---------" <br />December, 1994 <br />--------------- Lt. Rig Med.Rig Hvy.R ig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Cer Crane Truck Truck Truck <br />_____________________ <br />Ownership Cost/hr __________ <br />- 227.88 ________________________________ <br />f31.23 (38.36 21.81 ______________ <br />f19.89 ____________ <br />26.95 _________________ <br />f12.79 __________ <br />55.71 <br />Operating Lost/hr = E26.84 529.29 (34.27 25.12 f23.40 f18.53 E24.52 28.00 <br />Operator Cost/hr = (21.40 522.03 522.03 221.24 520.86 (21.24 221.24 521.24 <br />Helper Cost/hr = f20.60 521.24 (21.24 20.00 f0.00 20.00 20.00 f0.00 <br />Total = (96.72 5103.79 5115.90 528.17 E64. 15 246.72 f58.55 234.95 <br />NON-ROADABLE EQUIPMENT: <br />--------------------- - Neight Ownership Naul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Lost/hr Cost/hr <br />_____________ (no. hauled) <br />______________ Cost/hr <br />___________ Cost/hr <br />_____________ Cost/ea <br />_____________________ <br />Cat DbH __________ ___________________ <br />3.00 E28.00 596.72 1 f124.72 596.72 <br />Subtotals 2124.72 596.72 f0.00 <br />