Laserfiche WebLink
• Colorado Division of Minerals end Geology <br />ESTIMATING FORN - BULLD02ER NORK <br />Task Y: 5 Prep. by: BLP Tesk File Neme: X219-5 <br />Date: OS/23/96~Permit N:X-96-219 Nine: Cottonwood Lard <br />---"--'----' --`-_''-- ----------'-------- <br />Permit Action: Redistribute Topsoil on Peds 8 Access Roads <br />Task Description: NOI <br />HOURLY EGUI PMENT COST <br />_____________________ Basic Machine: Ca[ D6H SERIES 11 Norsepower: 165 <br />Blade Type: SEMI-UNIVERSAL -------- <br />Attachment k1: ROPS Ceb Shift easi s: 1/day <br />Attechnent R2: 3-shank ripper --------- <br />Cost Breakdown: <br />-------------- Utilization X <br />Ownership cost/hr = 524.34 N/A <br />Operating 8 overhaul tost/h r- dozer = 527.33 100 <br />-ripper = 50.00 0 <br />Operator Cost/hr = 522.95 N/A <br />Total egpt. unit cost/hr = 574.61 Total fleet cost/h r: 574.61 <br />MATERIAL OUANTIT IES <br />Initial Swetl Loose <br />Volume: 20,605.0 BCY Factor: 1.330 Volume: 27,404.7 LCY <br />Source of quantity take-off: not <br />Source of est. swell factor: cat handbook <br />HOURLY PRODUCTION <br />_________________ Job Condition Correct ion Factors <br />Avg. push distance: 100 ft. --------------------- ----------- <br />-________ Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.10 (Cat tbl) <br />dozer production: 362 LCY/hr Dozing nethod..... 1.00 (gen.) <br />--------- Visibility........ 1.00 (avg.) <br />Materiel consistency: Job efficiency.... 0.83 (1sh/day) <br />Partly consolidated stockpile Spoil pile factor. 0.90 (ssd-fc) <br />----------------------------- -------- Push gradient..... O.BB (Cat tbl) <br />Avg. push gradient: 6.00 X (pos) Altitude Beret ion. 1.00 (Cat tbl) <br />--------- Material weight... 0.79 (Cat tbl) <br />Avg. site altitude: 6600 ft. Blade type........ 1.00 (S, SU,U) <br />Material weight 2900.00 lb/LCY Net Job Correction 0.43 <br />Mat. Desc r,: --------- ----------- <br />Decorigrosed rock - 50% Rock, SOX Earth Adjusted Unit Prod.: 155.88 LCY/hr <br /> Adjusted Flee[ Production: 155.88 LCY/hr <br />JOB COST ----------- <br />Fleet size 1 Dozers) Total Job Tine: 175.81 Hours <br />--------- <br />- <br />-------- <br />Unit Cost 20.479 /LCY Total Job Cost: - <br />513,117.92 <br />