Laserfiche WebLink
>; <br />,. <br />HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Caoaciri <br />Basis <br />Material weight : 2,650 pounds/LCY <br />Material description <br />Decomposed rock - 25% Rock, 75% Earth <br />Rated payload : 48,000 pounds <br />Payload capacity : 18.11 LCY <br />Bowl (volume) Basis <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY "' <br />hoary producdon refleCb volume per scraper pair on push-pull models <br />Cvcle Time : Job Condiflon Corrections : Site altitude (ft.) : 6, 750 <br /> Scraper Push dozer Source <br />Scraper loading time' : 0.90 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />• load time per scaper pair on push-pull models Net cortection : 0.830 NA _ _. <br />Travel time <br />Road condition description :Rutted dirt little maintenance, no water, 2'tire penetration <br />Neal Rnutw <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 2, 600 0.00 5.00 5.00 2218 1.35 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 1.35 minutes <br />Rahrm route <br />'• travel trme for each segment is adjustetl for aaeleretion/tleteleroeon. <br />fade vebciees aro mez. adeinade Per total resistance shown, not average <br />Retum time <br />7.Od <br />minutes <br />Total scraper team cycte time (load + haul + maneuver and spread + return) : 3.93 minutes <br />Unadjusted unit production/hour : 519.27 LCY/hour •" Adjusted for job conditions : 430.99 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) houdy production : 430.99 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 430.99 LCY/hour <br />