Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division 0/Minerals And Geology <br />184 State :Colorado Permitlob # : C-98-083 <br />02252007 County :Delta Abbreviation :none <br />JRS Site :Bowie No. 2 Mine Filename : C083-184 <br />Permit or other job action :Technical Revision 45 <br />Task description :Replace Topsoil from Stockpile to Gob Pile iR? <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cos ere <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer : NA <br />Support equipment -Load area : A <br />-Dump area :NA <br />Road maintenance -Motor grader TNA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilizafion-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosVhour : $49.73 NA NA NA NA NA <br />Operatingcosf/hour: $130.19 NA NA NA NA NA <br />Ripper op.cosUhour: NA NA NA NA NA NA <br />Operatorcost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $204.87 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $409.74 Support : $0.00 Maintenance : $0.00 <br />