Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatintt Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division O/Minerals And Geology <br />183 State :Colorado Permitljob # : C-96-083 <br />02252007 County :Delta Abbreviation :none <br />JRS Site :Bowie No. 2 Mine Filename : C083-183 <br />Permit or other job action :Technical Revision 45 <br />Task description :Place 1.6 Feet of Cover on Gob Pile #3 <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Coat lire <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area <br />-Dump area : A <br />Road maintenance -Motor grader :NA <br />-Water truck :NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cosUhour : $49.73 NA NA NA NA NA <br />OperatingcosUhour: $130.19 NA NA NA NA NA <br />Ripper op.costlhour: NA NA NA NA NA NA <br />OperetorcosUhour: $24.95 NA NA NA NA NA <br />Unit subtotals : $204.87 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $409.74 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : x409.74 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 38,700 BCY factor: 1.250 volume: 48,375 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />