My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109161
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:46 PM
Creation date
11/24/2007 5:55:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
V. MINE PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.3.2.9 Coal Handling Structures <br />Trinidad Basin Mining employs an intermediate coal <br />storage area at the mine site for pit run coal before it is <br />transported to the loadout for crushing and sizing per customer <br />specifications. <br />The main ca~onent of the handling structures are located <br />in the City of Trinidad. Trinidad Basin Mining has leased a <br />loadout site from the Atchison, Topeka and Santa Fe Railway <br />Company for the purpose of storing, crushing, sizing and loading <br />croal into railroad cars for transport to customers. See Map <br />V-2. The coal is hauled from the mine via semi-tractor trailer <br />haul trucks and the coal is either placed into a stockpile or <br />dumped directly into the crusher. The coal is then processed <br />• through the crusher and screening plant. The coal is then <br />stockpiled or loaded directly into the railroad cars. <br />Upon conq~letion of the mining and the abandonment of <br />the loadout the site will be returned to its pram;n;nq and current <br />industrial use. The crusher and suing plant, buildings and <br />sedurent pond and ditches will be removed fran the site. Tne <br />site will be left in such a fashion as to allow future industrial <br />use. A11 of the coal fines will be reiroved and returned to the <br />pit for burial. <br />Topsoil does not exist at the site and no reclamation <br />work requiring topsoiling and seeding of the site is planned. <br />This type of reclamation work would not be consistent with the <br />• pOSt mining land LiSe. <br />V-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.