My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109132
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:37 PM
Creation date
11/24/2007 5:52:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000154
IBM Index Class Name
Permit File
Doc Date
4/30/2001
Doc Name
H & H STONE QUARRY 3 FN M-2000-154 2ND ADEQUACY REVIEW
From
DMG
To
H & H STONE CO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # 06a <br />Date. 04/25/2001 <br />User : SSS <br />State :Colorado <br />County ~ San Miguel <br />Site : H And H Stone <br /> <br />PermiUjob# : M-2000.154 <br />Abbreviation :none <br />#3 Filename : M154-O6a <br />Agency or organization name : DMG <br />Permit or other job action New 112c Quarry Application <br />Task description :Spread overburden <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8SU Horse ower ~ 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank upper <br />P <br />Shift basis ~ 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.41 NA <br />Operating cosUhour : $65.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosVhour : $27.99 NA <br />Total unit cosUhour : $144.38 Total fleet cosUhour : $144.38 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4, 033 LCY factor : NA volume : 4.033 LCY <br />Source of estimated volume :Assume 6 inch <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION J <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock - 25% Rock <br />0.00 % (pos) <br />6, 500 feet <br />2, 650 Ibs/LCY <br />75% EaRh <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.227 /LCY <br />over 5 acres <br />Condition Correction Factors _ Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.20 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1 shift day) <br />Spoil pile : 0.70 (ind-mf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cal HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.45 <br />Adjusted unit production : 635.14 LCY/hr <br />Adjusted fleet production : 635.14 LCY/hr <br />Total lob time : 6.35 Hours <br />Total job cost : $917 <br />
The URL can be used to link to this page
Your browser does not support the video tag.