My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109132
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:37 PM
Creation date
11/24/2007 5:52:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000154
IBM Index Class Name
Permit File
Doc Date
4/30/2001
Doc Name
H & H STONE QUARRY 3 FN M-2000-154 2ND ADEQUACY REVIEW
From
DMG
To
H & H STONE CO INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PROJECT IDENTIFICATION <br />Task # : OSa <br />Date : 04/25/2001 <br />User: SSS <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado PermiUjob# : M-2000-154 <br />County :San Miguel Abbreviation :none <br />Site : H And H Stone Quarry #3 Filename : M154-OSa <br />Agency or organization name : DMG <br />Permit or other job action :New 112c Quarry Application <br />Task description Spread waste rock <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Basic machine :Cat D8R - 8SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank upper <br /> Utilization <br />Ownership cosUhour : $50.41 NA <br />Operating cosUhour : $65.98 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : 3144.38 Total fleet cosUhour <br />G1dd @R <br />Initial Swell Loose <br />volume: 1,000 LCY factor: NA volume : 1,000 LCY <br />Source of estimated volume : estimate <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION - <br />~ - <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cal HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (fshift/day) <br />Loose stockpile Spoil pile : 0.80 (/nd-rfJ <br /> Push gradient : 1.00 (Cal HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6, 500 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2, 550 Ibs/LCY Net correction : 0.54 <br />Weight description <br />Sandstone Adjusted unit production : 754.34 LCY/hr <br /> Adjusted fleet production : 754.34 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time . 1.33 Hours <br />Unit cost . $0.191 /LCY Total lob cost ~ $191 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.