Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 07a <br />Date : 04/25/2001 <br />User: SSS <br />State Colorado PermiUjob# : M-2000-154 <br />County .San Miguel Abbreviation : none <br />Site . H And H Stone Quarry #3 Filename : M154-07a <br />Agency or organization name : DMG <br />Permit or other job action :New 112c Quarry Application <br />Task description :Spread topsoil over site <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Basic machine : Caf DBR - 8SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank upper <br /> Utilization <br />Ownership cosUhour : $50.41 NA <br />Operating cosVhour : $65.98 100 <br />Ripper op. cosUhour : $D.00 0 <br />Operator cosVhour : $27.99 NA <br />Total unit cosVhour : $144.38 Total fleet cosUhour <br />Initial Swell Loose <br />volume: 2,016 LGY factor'. NA volume <br />Source of estimated volume :Assume avg. 3 inch depth over 5 acres <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Jab Condition Correction Fai <br />Horsepower: 305 <br />2,016 <br />$144.38 <br />LCY <br />Source <br /> Operator skill : 0.75 (avc <br />Average push distance : 50 feet Material consistency : 1.20 (Cat ~ <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (ger <br /> Visibility: 1.00 (avc <br />Material consistency description : Job efficiency . 0.83 (1shiR, <br />Loose stockpile Spoil pile : 0.70 (fnd- <br /> Push gradient : 1.00 (Cat , <br />Average push gradient ~ 0.00 % (pos) Altitude : 1.00 (Cal <br />Average site altitude : 6, 500 feet Material weight : 1.10 (Caf <br /> Blade type : 1.00 (S/SL <br />Material weight . 2,100 IbsILCY Net correction : 0.57 <br />Weight description <br />Earth -Loam Adjusted unit production : 801.49 LCY/hr <br /> Adjusted fleet production : 801.49 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time . 2.52 Hours <br />Unit cost : $0.180 /LCY Total job cost : $363 <br />Shift basis : 1 per day <br />Data source: (CRG) <br />