My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109042
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:31 PM
Creation date
11/24/2007 5:44:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003030
IBM Index Class Name
Permit File
Doc Date
6/5/2003
Doc Name
Cost Summary Form
From
DMG
To
Joseph Dorris
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinta Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />Task # : 002 <br />Date : 06r052003 <br />User: JD7 <br />State :Colorado <br />County:Teller <br />Site :Glacier Peak Mining <br />Pennidjob 1e : M-2003-030 <br />Abbreviation :none <br />Filename : M030-002 <br />Agency or organisation name : DMG <br />Permit or other job action :Final Reclamation <br />task descdption :Contour and smooth grade disturbed areas <br /><>: :. <br />:. p <br />HOURLY EQUIPMENT COST Basic machine:CAT 914G Horse ower:~ 90 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Operating cost/hour <br />Operator cosbhour <br />Total unit cosghour <br />Utilization % <br />$9.53 NA <br />$12.73 100 <br />$30.65 NA <br />Data source : (CRG) <br />$52.91 Total Beet cosbhour: <br />$52.91 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume: 500 LCY factor: NA volume: 500 LCY <br />Source of quantity take-0B : Calculation <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION ~ ~~(Cat HB) <br />Loader Cycle Time Unadjusted basic cyGe time (load, dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material up fo 1re" diameter 0.020 (Cat HB) <br />Stockpile : Dumped by buck 0.020 (Cat HB) <br />Tmck ownership : Common ownership o/tacks and loaders -0.040 (Cat HB) <br />Opeation : Constant ope26on -0.040 (Cat HB) <br />Dump target : No adjustment -factor not applicable 0.000 (Cat HB) <br />Net cyGe time adjustment: -0.040 minutes <br />Adjusted basic cycle time: 0.435 minutes <br />Rollins Resistance -Road Conditions <br />Haul :Rutted dirt, IitBe maintenance, no water, 2" fin: penetration <br />Retum :Rutted dirt, little maintenance, no water, 2" fire penebabon <br />Haul and Refum Time Length <br />(feeq Gratle res. <br />(h) Rolling ms. <br />(°k) Total ms. <br />(%) Tmvel time <br />(minutes) Data <br />Source <br />Haul route : 50 2.00 5.00 7.00 0.0432 (Cat HB) <br />Re[um route : 50 -2.00 5.00 ~ 3.00 0.0282 ~ (Cat HB) <br /> Total travel time : 0.0714 minutes <br />Loader Bucket CaoaciN Total cycle time : 0.506 minutes <br />Rated rapacity: 1.70 LCY (heaped) (Cat HB) <br />Bucket fill factor 0.975 Loose material -mixed moist aggregates (95-f00%) <br />Adjusted rapacity: 1.66 LCY <br /> Source <br />Job Condition Conection Factors Altitude adjustment factor: 0.91 (Cat HB) <br />Site altitude: 8,800 feet Job efficiency factor: O.B3 (1 shiB/day) <br /> Net correction : 0.76 multiplier <br />Unadjusted hourly unit production : 196.39 LCY/Hr <br />Adjusted hourly unit production : 148.33 LCV/Hr (Cat HB) <br />Adjusted howdy Beet production : 148.33 LCYMr <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 3.37 Hours <br />Unit cost: $0.357 /LCY Total job cost: j178 <br />Cost Breakdown : Ovmership cosbhour <br />
The URL can be used to link to this page
Your browser does not support the video tag.