Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 State :Colorado <br />Date : 06/05/2003 <br />User: JDl <br />PermiUjob # : M-2003-030 <br />County :Teller Abbreviation :none <br />Site :Glacier Peak Mining Filename:M030-001 <br />Agency or organization name :DMG <br />Permit or other job action :Final Reclamation <br />Task description :68Ckflll eXCaVated Slte <br /> <br />HOURLY EQUIPMENT COST ,. <br />Machine description :Cat 312C Horsepower : 90 <br /> Weight (MT) : 13.14 <br />Cost Breakdown : Utilization <br />Ownershipcost/hour : $16.16 NA Shift basis : 1 perday <br />Operating cosUhour : $15.72 100 Data source : (CRG) <br />OperatorcosUhour: $30.84 NA <br />Total unit cosUhour : $62.72 Total fleet cosUhour : x62.72 <br />:: <br />MATERIAL QUANTITIES <br />Initial Swetl Loose <br />volume : 3,703 LCY factor : NA volume : 3,703 LCY <br /> <br />Source of estimated volume :calculation <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swino loaded dump bucket swing emoNl <br />Basic job condition description : EXCELLENT <br />Secondary job condition within basic description : AVERAGE <br /> Cycle time value : 0.17 minutes <br />Bucket Caoacitv <br />Rated bucket capacity : 0.88 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 1.05 Moist loam or sandy clay (100% - 110%) <br />Adjusted bucket capacity : 0.71 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 8,800 feet Altitude adjustment : 0.90 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shiR/day) <br /> Net job correction : 0.75 multiplier <br /> <br />Unadjusted hourly unit production : 246.21 LCY/hour <br />Adjusted houdy unit production : 183.92 LCY/hour <br />Adjusted houdy fleet production : 183.92 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 20.13 hours <br />Unit cost : $0.341 per LCY Total job cost : x1,263 <br />