Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # <br />Date <br />User. <br />003 State : Ca/orado <br />O6r052003 <br />JDt <br />Pennitlob # : M-2003-030 <br />County:Teller Abbreviation :none <br />Site:Glacier Peak Mining Filename:M030-003 <br />Agency or organization name : DMG <br />Permit or other job action :Final <br />Task description : R@p <br />HOURLY EQUIPMENT COST Basic machine: CAT 914G Horsepower: 90 <br /> Attachment no. 1 : ROPS Cab Shill basis : 1 per day <br /> Data source: (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cesbhpur : $9.53 NA <br /> Operating cosuhour . $12.73 100 <br /> Operator cosUhour : $30.65 NA <br /> Total unit cest/hour : $52.91 Total Beet cost/hour: $52.91 <br />MATERIAL QUANTITIES <br />Initial Swell Finel <br />volume: 200 CCY factor: 1.215 <br />Source of quantity take-0B :calculation <br />Source of estimated swell factor plpgrdm <br />HOURLY PRODUCTION (Cat HB) <br />Loader CvGe Time Unadjusted basic cycle time (load, dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Mateda/ up to 1/B" diameter 0.020 (Ca( HB) <br />Stockpile: Dumped by WCk 0.020 (Cat HB) <br />Tmck ownership : Common ownership o/trucks and loaders -0.040 (Cat HB) <br />Operation : Constant opemtlon -0.040 (Cat HB) <br />Dump target : No adjustment - /actor not applicable 0.000 (Cat HB) <br />Net cycle lime adjustment: -0.040 minutes <br />Adjusted basic cycle time: 0.435 minutes <br />Rollino Resistance -Road Conditions <br />Haul :Rutted did, little maintenance, no water, 2" hie penetreBOn <br />Retum :Rutted dirt, little maintenance, no wafer, 2"bre peneUafion <br />Haul and Retum Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel Bme <br />(minutes) Data <br />Source <br />Haul mute: 50 2.00 5.00 7.00 0.0432 (Cat HB) <br />Retum route : 50 -2.00 5.00 3.00 0.0282 (Cat HB) <br />Total Vavel time : 0.0714 minutes <br />Loader Bucket CaoaciN Total cyGe time : 0.505 minutes <br />Rated capacity : 7.70 LCY (heaped) (Cat HB) <br />Bucket fll factor: 0.975 Loose matedal-mixed moist aggregates (95700%) <br />Adjusted capacity: 1.55 LCV <br />Source <br />Fleet size: 1 Loatler(s) Total job time: 1.54 Hours <br />volume: 243 LCY <br />Unit cost: $0.357 /LCY Tptal job cost: j$7 <br />