My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108677
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:10 PM
Creation date
11/24/2007 5:09:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
pages 4-68a -4-144
Section_Exhibit Name
4.0 Continued
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Removal of Surface Facilities -Mine Site <br />Remove four (4) flumes $12,000 <br />Total Cost of Removal of Surtace Facilities <br />Sealing of Mine Portals -Mine Site <br />Cost of double row concrete block <br />seal in five (5) entries $4,500 <br />Cost of 4' concrete plugs in four <br />(4) entries $41,000 <br />Total Cost for Sealing Portals <br />Reclamation Cost including overhead and <br />Profit -Refuse Pile and Mine Site <br />Engineering Costs <br />12 000 <br />45 500 <br />$497,600 <br />1. Engineering and bid document prep-fees <br />4.25% ($497,600) $ 21,100 <br />2. Engineering services contract issuance <br />cost 1.75% ($497,600) $ 8,700 <br />Total Reclamation Cost $ 527,400 <br />The refuse pile was reclaimed in 1986. The work consisted of regrading the top bench of <br />refuse to establish a suitable final subgrade, covering all exposed refuse with 4' of cover, <br />extinguishing an old fire west of the pile, establishing a rip rapped channel and seeding. <br />The cover material was excavated from the upper wash plant pond to eliminate importing <br />soil. Other factors reducing the covering cost was the work previously done while the pile <br />was being constructed and the smaller total disturbed area than permitted. The remaining <br />earthwork at the site is eliminating the refuse pile sediment pond and establishing a rip <br />rapped channel across the reclaimed pond. <br />The revegetation work in the fall of 1986 involved seeding, fertilizing and crimping straw <br />mulch where possible and broadcast seeding, fertilizing and netting straw mulch on the <br />steeper slopes. <br />• 4-71 Revised June 1998 <br />RN-o3 <br />TR-ao <br />