Laserfiche WebLink
Revegetation - Refuse Pile <br />Cost of Seed $ 3,000 <br />Seeding fertilizing, and mulching (including fertilizer 13,400 <br />and straw) (8 acres) <br />Revegetation of refuse pond (1.1 acre @ $2000/acre) 2,200* <br />Cost of shrub and tree tubelings ($.15 @, 500/acre, 8 acres) 600* <br />Cost of planting tubelings ($250/acre, 8 acres) 2,000* <br />Total Cost of Revegetation $21,200 <br />Earthwork - Mine Site <br />Cut and fills (70,000 cy) $121,000 <br />Drainage control (rip-rap diversion and creek, 38,000 <br />clean No. 1 Mine yard pond) <br />Remove remaining drainage control (No. 1 Mine Yard Pond 3,700* <br />and associated ditches, 1850 cy @ $2 cy) <br />Miscellaneous (fencing, site clean up and mobilization) 11,000 <br />Total Cost of Earthwork $173,700 <br />Revegetation - Mine Site <br />Cost of seed, fertilizer and mulch $ 14,500 <br />Seeding, fertilizing and mulching (32 acres) 20,000 <br />Revegetation of drainage control (1.5 acres @ 2000/acre) 3,000* <br />Cost of shrub and tree tubelings ($.15 @, 500/acre, 32 acres) 2,400* <br />Cost of planting tubelings ($250/acre, 32 acres) 8,000* <br />Total Cost of Revegetation s 47,900 <br />*Estimate for remaining work <br /> <br />4-70 <br />Revised 11-6-87 <br />