Laserfiche WebLink
COLOkAUU WESTMURELANU 1NC. <br />HEFTING/TELEPHONE CONFERENCE RECORD <br />JOB OVERLAND CONVEYOR <br />TE June 22, 1984 <br />~TWEEN of <br />John Shumate of Lively Manufacturing <br />and Melvin 1.ladril of Colorado Westmoreland Inc. <br />SUBJECT Cost Estimate <br />SUHMARY: On submittal of June 12. 1984, Item ~l3 of the earthwork costs indicated 430' of <br />culvert, which was more than reouired. Because of lenoth of the short conveyor, steel <br />belting is not required, reducing the original cost estimate from $1,920,000 to $1,433,500. <br />iOLLOW-UP ACTION REQUIRED: Change original cost estimate. <br />Copies to: <br />File: Proposed overland convenor <br />:~-7.00 (10/80) <br />