Laserfiche WebLink
COLORAUU WESTMORELAND INC. <br />HEETINC/TELEPHONE CONFERENCE RECORD <br />JOB OVERLAND CONVEYOR <br />June 20. 1984 <br />EEN of <br />John Shumate of Lively Manufacturing <br />and Melvin Madril of Colorado Nesrmoreland Inc. <br />.iUBJECT Cost Estimate <br />SUHliARY: Area of short conveyor from point "W.P.D." to the west would not be required. <br />Therefore, this cost would need to be deducted from the short conveyor cost so that short <br />conveyor cost could be added to the long conveyor cost properly. <br />1. truck dump building. <br />2. stacking tube. <br />3. conveyor (300' <br />TOTAL DEDUCTED: $635,000. <br />John will check accuracy of 10'0" diameter culvert and steel belt requirement for earthwork <br />and call back. <br />;'OLLOW-UP ACTION REQUIRED: <br />;;o pies to: <br />Change cost estimate of May 17, 1984. <br />File: Proposed overland convevor <br />"c:-7.00 (10/80) <br />