Laserfiche WebLink
[NGIN[[R• AND CONTRACTOR[ <br />LIVELY MANL~FACTUgING AND E PMENT <br />~ ~~'~~ P O BOx 379 <br />GLEN WHITE. WEST VIRGINIq YSfia9 <br />7ELEPHOHE 7(48561600 <br />November 6, 1984 <br />Mr. Melvin W. Madrid <br />Colorado Westmoreland, Inc. <br />P.O. Box E <br />Paonia, CO 81428 <br />Subject: Budget Estimates <br />Our P83-155-Revised <br />Dear Melvin: <br />'This letter is a confirmation of our discussions of November 5 and November 6, <br />1984, concerning John 9~umate's letter of June 12, 1984. <br />You had requested cost breakdowns for the site preparation Work required for <br />the construction of a truck dump and conveying systems at your Orchard Valley <br />facility. these breakdowns are as follows: <br />• Excavation (Conveyors and Haul <br />Excavation (T}-uck Amp area) <br />Engineered Backfill (all areas) <br />Spoil disposal (all areas) <br />Clearing and Grubbing <br />Seeding (all areas) <br />Road Sl~rfacing <br />Roads) 510.00 per cubic yard <br />x6.00 per cubic yard <br />520.00 per cubic yard <br />53.00 per cubic yard <br />52,800.00 per acre <br />$1,100.00 per acre <br />55.00 per square yard <br />You had also requested the cost for steel cable belting and the projected <br />construction time for the proposed work. <br />The cost for the steel cable belting for the Long Corneyor was 5507,500.00 <br />(17,500 feet @529.00 per foot). The Short Corneyor belting was 5188,500.00 <br />(6,500 feet @ 529.00 per foot). <br />the projected duration of construction would be 18 months for work beginning <br />with the site preparation through facilities start-up. This duration would <br />depend upon being able to work on conveyor erection while the site preparation <br />continues in other areas. <br />On Nov®ber 6, you requested the cost breakdown for adding a second truck dimp <br />and emergency storage. The breakdown for adding the second TYuck Duap, Cover <br />over two TYuck Amps, and a Conveyor for emergency storage was 5275,000.00. <br />• <br />