My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108314
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:46 PM
Creation date
11/24/2007 4:37:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
APPENDIX C
Section_Exhibit Name
Coal Transportation - TRANSPORTATION EA Removed by MR108 6/29/04
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #1 - Long Conveyor - In this estimate, lively inlcuded ali earthwork <br />costs for excavation in Exhibit #1. They also redesigned and decided that <br />• steel cable belting was required for the long conveyor and also included <br />this cost, <br />Item #2 - This was clarified Exhibit #2 and Exhibit #3 of the short con- <br />veyor, calculating the cost estimate for the coal haulage road and all site <br />work preparation necessary for installation of the road, truck dunp, and <br />stockpile area. <br />Item #3 - Low Profile <br />This clarified Exhibits #2 and #3 earthwork cost estimates and the short <br />conveyor estimates. The second truck dump for the tandem and a totally <br />enclosed buildiny for the total truck dump as well as a short stacking con- <br />• veyor to provide stockpile capabilities at this point was included. This <br />item also included the remainder of the conveyor earthwork cost estimates <br />and revised the culvert required, lessening it to only a culvert underneath <br />the actual Farmer's Mine Road and Fire Mountain Canal. It also included a <br />cost for installing steel cable belting for the short conveyor. <br />Item #4 - Short Conveyor, High Profile - In this item, the high profile con- <br />veyor earthwork was cost estimated, including the truck dump modification <br />and emeryency stockpile conveyor. It also included the remainder of the <br />conveyor's earthwork costs and added the steel cable belting. <br />June 20, 1984 Telephone Conversation - In this telephone conversation <br />between CWI and Lively, the proposal of June 12, 1984, was further clari- <br />• fied, In order to calculate the cost of the long conveyor, the original May <br />17, 1984, letter stated a separate cost on the short conveyor from the <br />
The URL can be used to link to this page
Your browser does not support the video tag.