My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108314
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:46 PM
Creation date
11/24/2007 4:37:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
APPENDIX C
Section_Exhibit Name
Coal Transportation - TRANSPORTATION EA Removed by MR108 6/29/04
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transfer point to the truck dump. Since the June 12, 1984, letter contained <br />costs for the revisions to the truck dump, Lively provided us now with a <br />• total adjustment of $635,000. <br />CWI also requested that Lively check if the steel cable conveyor belt <br />requirements for the short conveyor were necessary. <br />June 22, 1984 Telephone Conversation - In this telephone conversation <br />between CWI and Lively, Lively stated that Item N3 of the June 12, 1984, <br />letter contained an error in the earthwork costs under the culvert. Also, <br />steel cable belting would not be required for the short conveyor, therefore <br />the adjustment to the original cost estimate was done. <br />November 6, 1984 Response Letter - In this letter, Lively responded to CWI's <br />request for unit cost breakdowns of the different areas related to the June <br />• 12, 1984, cost estimates. Lively separated costs for earthwork, steel cable <br />belting, and the truck dump modifications. With this information, CWI dif- <br />ferentiated between actual earthwork and mechanical costs in the overall <br />proposals. <br />November 6, 1984 Calculations - Subsequent to Lively submitting breakdowns <br />on cost estimates, CWI revised the earthwork costs to reflect local pricing. <br />The adjustments were made to the various items of construction and the total <br />revised. A summary of total costs is also completed. <br />Summary - Both a high profile and a low profile conveyor system were <br />studied. Based on public input and cost comparison, CWI selected the low <br />• conveyor system. The estimate cannot be more realistic unless further <br />detailed design work is completed. The final adjusted cost estimates are <br />outlined on the following table. ~ ~-~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.