transfer point to the truck dump. Since the June 12, 1984, letter contained <br />costs for the revisions to the truck dump, Lively provided us now with a <br />• total adjustment of $635,000. <br />CWI also requested that Lively check if the steel cable conveyor belt <br />requirements for the short conveyor were necessary. <br />June 22, 1984 Telephone Conversation - In this telephone conversation <br />between CWI and Lively, Lively stated that Item N3 of the June 12, 1984, <br />letter contained an error in the earthwork costs under the culvert. Also, <br />steel cable belting would not be required for the short conveyor, therefore <br />the adjustment to the original cost estimate was done. <br />November 6, 1984 Response Letter - In this letter, Lively responded to CWI's <br />request for unit cost breakdowns of the different areas related to the June <br />• 12, 1984, cost estimates. Lively separated costs for earthwork, steel cable <br />belting, and the truck dump modifications. With this information, CWI dif- <br />ferentiated between actual earthwork and mechanical costs in the overall <br />proposals. <br />November 6, 1984 Calculations - Subsequent to Lively submitting breakdowns <br />on cost estimates, CWI revised the earthwork costs to reflect local pricing. <br />The adjustments were made to the various items of construction and the total <br />revised. A summary of total costs is also completed. <br />Summary - Both a high profile and a low profile conveyor system were <br />studied. Based on public input and cost comparison, CWI selected the low <br />• conveyor system. The estimate cannot be more realistic unless further <br />detailed design work is completed. The final adjusted cost estimates are <br />outlined on the following table. ~ ~-~ <br />