My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107818
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:18 PM
Creation date
11/24/2007 3:53:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
Permit File
Doc Date
3/9/1978
Doc Name
REGULAR PERMIT APPLICATION FORM BOETTCHER LIMESTONE QUARRY IDEAL BASIC INDUSTRIES INC
From
Ideal Basic Industries
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />EY.}IIRIT D (Revised 4-?8--78) <br />' (d) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Impoundments of surface drainage in the relatively <br />impervious floor and high wall of the A-hand quarry are <br />as follows: <br />I~A:i1~ bcc-1356--3 to 5-acre surface area <br />Iv1aps bcc-1357 and 1358--5 to 7-acre surface area <br />and small area in older quarry east of the <br />haul road. <br />Map bcc-1358--2 to 4-acre surface area <br />6 <br />The level and size of these impoundments vary with <br />precipit,ition conditions. Leakage at the flood ditch quarry <br />crossing has been reduced by sealing work. <br />Size of wren to be vrorked at any one time <br />1'he fourth cut A-band quarry disturbed since J~.1y 1, <br />1976 i outlined 'in red on maps 4 and 5 and comprises <br />;'/ ur.rec, including deposition of overburden. The north <br />end A-band quarry, disturbed since January 1976 (outlined <br />in red) is that portion of maps 5 and 6 located north of the <br />unnamed drainage and comprises 94 acres. This total of <br />1?1 acres is estimated as required to supply the cement plant <br />until startup of the preheater kiln. <br />It4ining equipment and earth-moving methods currently <br />used must be adapted to supply a uniform blend of at <br />least four different materials to nevr kiln equipment with <br />which ldual has had no previous experience. This future quarry <br />will start with operations in bands C, E1, E2 and E3 at separate <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.