My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107790
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:16 PM
Creation date
11/24/2007 3:50:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995009
IBM Index Class Name
Permit File
Doc Date
8/22/2002
Doc Name
Cost Summary Form
From
DMG
To
Fisher Sand and Gravel Co.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task#: 002 <br />Date : 08/22/2002 <br />User : JD7 <br />Agency or organization name : DMG <br />Permit or other job action :Final Reclamation <br />Task description :Grading & Contouring <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat DBR - 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume: 58,000 LCY <br />Swell Loose <br />factor: NA volume: 58,000 LCY <br />Source of estimated volume :calculation <br />Source of estimated swell factor : NA <br />tIOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Loose stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />State :Colorado <br />County :Kit Carson <br />Site :Fosse <br /> Utilization <br />Ownership cosVhour : $42.44 NA <br />OperatingcosUhour : $59.07 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $30.65 NA <br />Total unit cosUhour : $132.17 Totat fleet cost/hour <br />100 feet <br />931.6 LCY/hr <br />0.50 % (i <br />4,500 feet <br />2,550 Ibs/LCY <br />Job Condition Correction Facto <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient: 1.01 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.57 <br />$132.17 <br />Source <br />Adjusted unit production : 532.79 LCY/hr <br />Adjusted fleet production : 532.79 LCY/hr <br />Permitfjob# : M-1995-009 <br />Abbreviation :none <br />Filename : M009-002 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 108.86 Hours <br />Unit cost : $0.248 /LCY Total job cost : $14,388 <br />
The URL can be used to link to this page
Your browser does not support the video tag.