My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107790
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:16 PM
Creation date
11/24/2007 3:50:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995009
IBM Index Class Name
Permit File
Doc Date
8/22/2002
Doc Name
Cost Summary Form
From
DMG
To
Fisher Sand and Gravel Co.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 001 State :Colorado Permitlob# : M-1995-009 <br />Date : 08/22/2002 County :Kit Carson Abbreviation : none <br />User : JD1 Site :Fosse Pit Filename : M009-001 <br />Agency or organization name :OMG <br />Permit or other job action :Final Reclamation <br />Task description : B8C1C11I1 and COIItOUf h%ghWallS <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R - 8U Horsepower : 305 <br /> Blade type :Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown ~ Ownership cosUhour : $42.44 NA <br /> OperatingcosUhour : $59.07 100 <br /> Ripper op. cosUhour : $0.00 NA <br /> Operator cosUhour : $30.65 NA <br /> Total unitcost/hour : $132.17 Total fleetcosUhour: $132.17 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 121,000 BCY factor : 1.250 volume: 151,250 LCY <br />Source of estimated volume :Permit <br />Source of estimated swell factor :program <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted howdy production : 685.7 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshifUday <br />Consolidated stockpile Spoil pile : 0.80 (/nd-rf) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : i.00 (Cat HB) <br />Average site altitude : 4,500 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.56 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 386.57 LCY/hr <br /> Adjusted fleet production : 386.57 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 391,26 Hours <br />Unit cost : $0.342 /LCY Total job cost : $51,712 <br />
The URL can be used to link to this page
Your browser does not support the video tag.