My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107790
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:16 PM
Creation date
11/24/2007 3:50:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995009
IBM Index Class Name
Permit File
Doc Date
8/22/2002
Doc Name
Cost Summary Form
From
DMG
To
Fisher Sand and Gravel Co.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFlCATION <br />Agency or organization name <br />Task#: 003 State:CObzatlo PermiVOb #:M-1995-009 <br />Data: 0821/2002 County: K4 Carson Abbreviation:nane <br />User: /01 Ska:Fasse Pit Filename: M00&003 <br />Permit or other job action :Final Reclamation <br />Task tlescripticn :Grading and COnt0udng <br /> <br />HOURLY EQUIPMENT COST Bask machine:CAT980G Stantlard lie Horsepower: 300 <br />Attachment no.l:ROPS Cab Shill basis: lper tlay <br />Cost Breakdown: Ownershipcosbhour: $33.32 Cost tlata source: (CRG) <br />Operating casphour: §d2.52 100%job utilization <br />Operator casUhour $30.84 <br />Tatel unit casVhour: $108.68 Total fleet cosMour: $706.66 <br />MATERIAL OUANRfIES <br />InRial Swell Final <br />volume: 16,000 LCY facron NA volume: 16,000 LCV <br />Source of quantity take-oH :Calculation <br />Source of estimatetl swell factor: NA <br />(Cef HB) <br />I ostler Gvde Time Unatllusted bask cyGe time (load, dump, maneuver): 0.525 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Meterial uprol/B'diameter 0.020 (Cat HB <br />Stackpile: OUmped by truck 0.020 (Cat HB <br />Truck ownership: Common ownership of trucks end baders -0.060 (Cat HB) <br />Operelion: Constant operation -0.040 (Car HB <br />Dumptargec Nominal target 0.000 (Cal HB <br />Net cycle time adjustrnent -0.040 minutes <br />Atlluste0 basic cycle time: 0.485 minutes <br />Roli'no Res stance - Roatl Gontlitinn=_ <br />Haul :Rutted dirt. little maintenance, no water, 2'tire penetraHOn <br />Relum :Rutted dirt, IMIe maintenance, no ware:. 2'tire penetration <br />Haul and Return Time LengM Gmtle res. Rolling res. Total res. Travel time Data <br />200 <br />Total travel time: O.df9 minutes <br />I oader Rocket Capacity Total cyda time: 0.904 minutes <br />Ratetl capacity: Z50 LCY (heapetl) (Cat HBJ <br />Bucket till tacton 1.100 OMer-rock/dirt mixtures (100-120;5) <br />Atljustetl capacity: 8.25 LCV <br />Jab Canditbn Correction Factors Source <br />Site altitude: 4,500 feet Altdude adlustment lector: L00 ~ (Cat HB) <br /> Job eHicienry tacton 0.83 (1 shiR/day) <br /> <br /> Net correction: O.B3 multiplier <br />Unadjusted hoary unit protluction: 54746 LCVMr <br />Atljustetl hoary unit production : d5d.39 LCVMr (Cat HB) <br />Adjusted hourly fleet protluction: 454.39 LCVMr <br />JOB TIME AND COST <br />Fleet site: 1 Loatler(s) <br />Unit cost $0.235 ILCY <br />Total job time: 35.21 Hours <br />Total lob wst: $3,756 <br />
The URL can be used to link to this page
Your browser does not support the video tag.