Laserfiche WebLink
POWDERHORN cowl COMPANY <br />SOUTH LEASES EXPLORATION PLAN <br /> 1985 <br /> TABLE 2 <br />• <br /> RECLAMATION COSTS <br /> <br />Road to PCC-04 Length: 1,000 ft. Width: 15 ft Area Acres: 0.34 <br />ITEM QUANTITY UNIT UNIT COST TOTAL COST <br /> <br />Rippina s Regrading <br />Cat D-7 Dozer with <br />Ripper and Operator 1.5 Hrs 5150.00 225 <br />Reclamation <br />1 - Cat D-5 Dozer with <br />Tye Range Dri11 and <br />Operator 1.5 Hrs 70.00 105 <br />2 - Fertilizer 0.34 Acres 372.00 126 <br />3 - Seed 0.34 Acres 84.00 29 <br />~3 •!lulching - Finn Straw- <br />blower (Mechanical <br />crimo_ covered in <br />item 1 above) 0.39 Acres 100.00 39 <br /> 519 <br />MISCELLANEOUS COST <br />Estimated Contractor <br />Overhead 8 Profit <br />Overhead @ 158 78 <br />Profit @ 108 52 <br />649 <br />• <br /> <br />