Laserfiche WebLink
POWDERHORN COAL COMPANY <br />SOUTB LEASES EXPLORATION PLAN <br /> 1985 <br />• TABLE 2 <br /> RECLAMATION COSTS <br />Road to PCC-03 Length: 5,280 ft. Width: 15 ft Area Acres: 1.82 <br />ITEM QUANTITY UNIT UNIT COST TOTAL COST <br /> <br />Ripoina 6 Rearadinq <br />Cat D-7 Dozer with <br />Ripper and Operator 8 Brs 5150.00 51,200.00 <br />Reclamation <br />1 - Cat D-5 Dozer with <br />Tye Range Drill and <br />Operator 8 Hrs 70.00 560.00 <br />2 - Fer~ilizer 1.82 Acres 372.00 676.00 <br />3 Seed 1.82 Acres 84.00 153.00 <br />• <br />4 <br />Mulching - Finn Straw- <br />blower (Mechanical , <br />crimp covered in , <br />item 1 above) 1.82 Acres 100.00 182.00 <br /> 51,571.00 <br />Mobilization/Demobilization <br /> <br />Cat D-7 2 Hrs 130.00 260.00 <br />Cat D-5 2 Hrs 130.00 260.00 <br />Reclamation Equipment <br />1 - Set 2 Hrs 60.00 120.00 <br />S 640.00 <br />Miscellaneous Cost <br />Estimated Contractor <br />Overhead i Profit <br />Ov rhead B 159 S 416.00 <br />Pit ? lOH S 277.00 <br />54,104.00 <br />....Y ^:5 ~ }t ~.... mil s.. <br />