Laserfiche WebLink
20WDERHORN COAL COMPANY <br />SOUTH LEASES EXPLORATION PLAN <br /> 1985 <br />• TABLE 2 <br /> RECLAMATION COSTS <br />Road to PCC-06 Lenqth: 8,000 ft. Width: 15 ft Area Acres: 2,75 <br />ITEM QUANTITY UNIT UNIT COST TOTAL COST <br /> <br />Ripping s Regrading <br />Cat D-7 Dozer with ' <br />Ripper and Operator 12.1 Hrs 5150.00 1,815 <br />Reclamation <br />1 - Cat D-5 Dozer with <br />Tye Range DriIL and <br />Operator 12.1 Hrs 70.00 847 <br />2 - Fertilizer 2.75 Aczes 372.00 1,023 <br />3 - Seed 2.75 Acres 84.00 231 <br />3•Mulchinq - Finn Straw- <br />blower (Mechanical <br />crimp covered in <br />item 1 above) 2.75 Acres 100.00 275 <br /> 4,191 <br />MISCELLANEOUS COST <br />Estimated Contractor <br />Overhead s Profit <br />Overhead @ 15B 629 <br />Profit @ 108 419 <br />5,239 <br /> <br />